The heavy build, in order

Prep runs deep: grind past oil-soaked surface concrete until clean pores show, or the bond fails where it counts most. Spalls and joint edges get rebuilt, since wheels find every flaw.

The build then stacks: primer where damp or oil history calls for it, a high-build base, and a hard top picked for the chemicals in the room. We name the stack in the written quote.

  • Grind past oil to clean concrete
  • Joints and spalls rebuilt for wheels
  • Stack named in the written quote
  • Heavy scope confirmed at the look

Recent floors

Get a Free Estimate in Apopka

Tell us about the floor. We call back with a time to come look — the written price comes after the in-person look, before any work starts.

Rather talk? Call (407) 555-0139.

Questions we hear

Can it take forklifts?

The right build can. Wheel load and tire type set the stack, so we confirm that scope at the look and write it into the quote.

What about oil and fuel spills?

Sealed tops wipe clean and resist shop fluids. Long-standing oil in the slab is ground out in prep; deep cases get flagged at the look.

Can you mark safety lines?

Line work can ride in the top coat stage where the plan calls for it. We map lines with you before the coat day.

How long does a bay stay down?

Phasing keeps most of a shop live. Each part gets a written return time by system; fast-cure tops shorten the wait.

Do you work around our shifts?

Yes. Off-hours and phased plans are the norm for work floors, set in writing before the start.

Estimate Calculator

Pick your floor and its size. The range updates as you go.

Add-ons your floor may need

Your planning range —

Every floor is different. Slab condition moves the final number more than size does.

These are planning ranges, not a quote — your final price is confirmed after an in-person look, before any work starts.

Call (407) 555-0139 Estimate Calculator