

Two-car garage, full-flake system
The slab had oil spots near the door and a long crack down the middle. We ground the whole floor, filled the crack, checked for damp, and ran a full-flake system with a clear top coat.
Ground prep, a damp check, and a written price before work starts. Garages, lanais, and pool decks across Northwest Orange County.


A good garage floor starts with the slab, not the can. We grind the concrete open, check it for damp, fix the cracks, and only then lay the coat. That order is why our floors stay down in Florida heat.
Most of our work is garage floors for homes in Apopka and Northwest Orange County. We also coat lanais, patios, and pool decks, plus work floors for shops and stores.
Slabs near the Wekiva River and Rock Springs run damp for much of the year. Ground water sits high here, and summer air is wet. A coat laid on a damp slab will blister. We test first, and we say so plain.
You get a written price after an in-person look, before any work starts. No guess over the phone, and no change once we start unless you ask for one. Start with the cost guide if you want the numbers first.
Bare concrete is fine until oil, damp, and heat start to work on it. Here is the plain side-by-side most folks ask for at the estimate.
| Bare concrete | Our coated floor | |
|---|---|---|
| Oil and stains | Soaks in and stays | Sits on top; wipes up |
| Damp from the slab | Wicks up, can smell musty | Tested first; primer blocks damp where needed |
| Hot tires | Leaves black marks | Hard top coat resists pickup |
| Cleaning | Sweep only; stains stay | Sweep, then a damp mop with mild soap |
| Sun at the door | Fades and dusts | Top coat holds its color in sun |


The slab had oil spots near the door and a long crack down the middle. We ground the whole floor, filled the crack, checked for damp, and ran a full-flake system with a clear top coat.


This older garage had a thin paint coat that was lifting in sheets. We ground the old coat off, patched two spalls, and laid a full-flake floor in a warm gray blend.
The owner parks in full sun, so the door line took a fast-cure coat that holds its color. The slab was dry, the grind was clean, and the car was back in two days later.


A newer home with a fresh slab and a sealer that had to come off first. We ground the sealer away, then ran a polyaspartic system picked for fast cure and sun at the door.
This shop floor took oil and parts drops for years. We ground the stains out, filled the pits, and laid a solid-color coat that wipes clean and shows a dropped bolt at a glance.
A slab from an older home, with damp that read high near the back wall. A moisture primer went down first, then the full-flake system the owners picked from samples at the estimate.
Garages are the core job. The rest of the menu grows out of the same prep and the same crew.

Our most picked garage floor. Flake is spread thick into the base coat, then sealed with a clear top coat.

A swirled, one-of-a-kind finish for show garages and rooms that need to stand out.

A fast-cure coat that holds its color in sun and stands up well to hot tires.

Fast-cure coats can put many garages back in use the next day. Your dates are set in writing first.

Peeling kit floor or worn old coat? We grind it off and start the slab over the right way.

Coated floors for work rooms, home gyms, and living space built on a slab.

A sealed, easy-to-clean coat for plain concrete, with a clear talk on coat vs. stain first.

Grip under wet feet and a top coat that holds up in full Florida sun.

Outdoor flat work gets its own talk on sun, rain, and wear at the in-person look.

Tough floors for shops, stores, and work bays, planned around your hours.

Heavier builds for hard use, oil, and daily wear.

Big floors coated in planned parts so your work can keep moving.

Clean, bright floors for rooms where folks walk in and look down.
The same steps run on each job, in this order. The slab sets the pace, not the clock.
We come out, measure the floor, and read the slab: cracks, oil, old coats, and damp. You pick a system and a color from real samples.
We grind the whole floor with a diamond grinder and dust control. The coat needs open pores to grip. We do not etch and roll.
Cracks get chased and filled. Pits and spalls get patched and ground flush. Damp slabs get a moisture primer first.
The base coat goes down at full build. On flake floors, we spread flake by hand until the wet coat can hold no more.
A clear top coat seals the floor. We walk the job with you and leave care steps and return times in writing.
Tell us about the floor. We call back with a time to come look — the written price comes after the in-person look, before any work starts.
Rather talk? Call (407) 555-0139.
It turns on size, slab shape, and the system you pick. Use the calculator on this page for a planning range. Your firm price comes in writing after we look at the slab, before any work starts.
Most peel comes from weak prep: a thin coat rolled on a smooth or damp slab. We grind the slab open, test for damp, and fix cracks first. That is the whole ball game.
Walk times are hours for fast-cure tops. Cars take longer, often one to three days by system. Your return times come in writing at the walk-through.
Hot tires lift thin, soft coats. A full-build base with a hard top coat is made for Florida heat and daily parking. Tire marks wipe off; the coat stays down.
Flake gives the floor some tooth. On wet areas like lanais and pool decks we add grip to the top coat. Tell us how the floor gets used and we set the texture to match.
Yes, once it is off. Old coats and paint come off with the grinder as part of prep. What is under them decides the rest, and we show you what we find.
Yes. Outdoor floors get a sun-stable top coat and grip for wet feet. See the pool deck and patio page for how those jobs differ.
Pick your floor and its size. The range updates as you go.
Add-ons your floor may need
Every floor is different. Slab condition moves the final number more than size does.
These are planning ranges, not a quote — your final price is confirmed after an in-person look, before any work starts.