Lanai floor, flake system
The lanai slab stayed damp after rain and felt slick in bare feet. We ground it, added grip to the top coat, and used a sun-stable finish so the color holds by the screen door.

Slope and drainage lead. A coat cannot fix water that pools or runs at the house. Next come cracks and joints: drives move more than garage slabs, and movement prints through coats.
Sun load sets the top coat, and tire turns at the apron set the build. If your drive fails those checks, we say so and tell you what we would do instead with our own money.
The lanai slab stayed damp after rain and felt slick in bare feet. We ground it, added grip to the top coat, and used a sun-stable finish so the color holds by the screen door.
The old deck coat had worn thin and got slick when wet. We ground it back, fixed two cracks, and laid a textured coat made for wet feet, sun, and pool water.
Tell us about the floor. We call back with a time to come look — the written price comes after the in-person look, before any work starts.
Rather talk? Call (407) 555-0139.
Only sun-stable tops go outdoors in our work. Plain epoxy ambers and chalks in Florida sun, so it never caps an outdoor job here.
Cracks get filled first. Cracks that still move can print back through any coat; we mark them at the look so you decide with full facts.
Then drainage is the first job, not the coat. We will tell you that plain at the estimate and point to the fix order that makes sense.
Outdoor fast-cure tops often take tires in a day or two. Your times come in writing, set by the system and the weather that week.
Texture goes in the top for wet grip, same as a pool deck. Smooth gloss has no place on a drive.
Pick your floor and its size. The range updates as you go.
Add-ons your floor may need
Every floor is different. Slab condition moves the final number more than size does.
These are planning ranges, not a quote — your final price is confirmed after an in-person look, before any work starts.